codegurukool.com · Free coding tutorials & online compiler

Home › COBOL Tutorial › COBOL project: payroll report

COBOL project: payroll report

Tables, loops, arithmetic and edited output together.

This program stores three employees in a table, calculates each pay as hours times rate, adds up a grand total and prints it with edited pictures. Try changing the hours, or adding a fourth employee (remember to change OCCURS 3).

Example code

       IDENTIFICATION DIVISION.
       PROGRAM-ID. PAYROLL.
       DATA DIVISION.
       WORKING-STORAGE SECTION.
       01 EMP-TABLE.
          05 EMP OCCURS 3 TIMES.
             10 E-NAME  PIC X(8).
             10 E-HOURS PIC 99.
             10 E-RATE  PIC 99.
       01 IDX      PIC 9.
       01 PAY      PIC 9(4).
       01 GRAND    PIC 9(5) VALUE 0.
       01 PAY-ED   PIC ZZZ9.
       01 GRAND-ED PIC ZZ,ZZ9.
       PROCEDURE DIVISION.
           MOVE "Ada" TO E-NAME(1).
           MOVE 40 TO E-HOURS(1).
           MOVE 20 TO E-RATE(1).
           MOVE "Bo" TO E-NAME(2).
           MOVE 35 TO E-HOURS(2).
           MOVE 18 TO E-RATE(2).
           MOVE "Cy" TO E-NAME(3).
           MOVE 20 TO E-HOURS(3).
           MOVE 25 TO E-RATE(3).
           PERFORM VARYING IDX FROM 1 BY 1 UNTIL IDX > 3
               COMPUTE PAY = E-HOURS(IDX) * E-RATE(IDX)
               ADD PAY TO GRAND
               MOVE PAY TO PAY-ED
               DISPLAY FUNCTION TRIM(E-NAME(IDX)) ": "
                   FUNCTION TRIM(PAY-ED)
           END-PERFORM.
           MOVE GRAND TO GRAND-ED.
           DISPLAY "Total: " FUNCTION TRIM(GRAND-ED).
           STOP RUN.

Run this code in the online editor

← COBOL file handlingLive project: Payroll calculator →