Home › COBOL Tutorial › COBOL project: payroll report
COBOL project: payroll report
Tables, loops, arithmetic and edited output together.
This program stores three employees in a table, calculates each pay as hours times rate, adds up a grand total and prints it with edited pictures. Try changing the hours, or adding a fourth employee (remember to change OCCURS 3).
Example code
IDENTIFICATION DIVISION.
PROGRAM-ID. PAYROLL.
DATA DIVISION.
WORKING-STORAGE SECTION.
01 EMP-TABLE.
05 EMP OCCURS 3 TIMES.
10 E-NAME PIC X(8).
10 E-HOURS PIC 99.
10 E-RATE PIC 99.
01 IDX PIC 9.
01 PAY PIC 9(4).
01 GRAND PIC 9(5) VALUE 0.
01 PAY-ED PIC ZZZ9.
01 GRAND-ED PIC ZZ,ZZ9.
PROCEDURE DIVISION.
MOVE "Ada" TO E-NAME(1).
MOVE 40 TO E-HOURS(1).
MOVE 20 TO E-RATE(1).
MOVE "Bo" TO E-NAME(2).
MOVE 35 TO E-HOURS(2).
MOVE 18 TO E-RATE(2).
MOVE "Cy" TO E-NAME(3).
MOVE 20 TO E-HOURS(3).
MOVE 25 TO E-RATE(3).
PERFORM VARYING IDX FROM 1 BY 1 UNTIL IDX > 3
COMPUTE PAY = E-HOURS(IDX) * E-RATE(IDX)
ADD PAY TO GRAND
MOVE PAY TO PAY-ED
DISPLAY FUNCTION TRIM(E-NAME(IDX)) ": "
FUNCTION TRIM(PAY-ED)
END-PERFORM.
MOVE GRAND TO GRAND-ED.
DISPLAY "Total: " FUNCTION TRIM(GRAND-ED).
STOP RUN.